4. SAP Modules questions
|
| 4.1 What is the
difference between updated project and end to end project. please explain
|
| 4.2 What is Ranking
order in automatic payment programme ?
|
| 4.3 What is SAP APO?
|
| 4.4 What are the
support tickets given in SAP fico module? please give some examples.
|
| 4.5 How is bank
reconciliation handled in SAP?
|
| 4.6 How do you
configure electronic bank statement?
|
| 4.7 How do you
configure manual bank statement?
|
| 4.8 What is dunning?
|
| 4.9 What is the
difference between profit center accounting and Profitability analysis ?
|
| 4.10 What are the
manufacturing cost of a producting?
|
| 4.11 What is the
difference between stock transfer between two plants belongs to same company
code and to that of different company code?
|
| 4.12 In real time, How
listing and exclusion is used ?
|
| 4.13 What is the
schema you use in Time Management?
|
| 4.14 In SAP-HR, What
is the landscape of your project?
|
| 4.15 What is the role
of abapers? What is the Work Bench?
|
| 4.16 How to integrate
MM With Fico?
|
| 4.17 What is
difference between business area or cost centre?
|
| 4.18 How to create Tax
Calculation Procedure?
|
4.19 What is Legaccy
System Migration Workbench? How it can be carried out in SAP SD?
|
| 4.20 What are the
fields in purchasing view?
|
| 4.21 How do you create
movement types? What are the steps involved? When will you recommend a new
movement type?
|
4.1 What is the difference between updated project and end to end project.
please explain
|
|
Some organisations select to implement SAP module by module, thus gets updated
as per their convenience / schedule. This is called as updated project. Some
organisations simply plan all integrated functional modules and decide to
go-live with all functional modules and take their entire operations on SAP.
This is called as End to End SAP implementation project.
|
4.2 What is Ranking order in automatic payment programme ?
|
|
Its the priority assigned to each house bank which helps Automatic Payement
program choose the house bank for payment in case there are more than one bank
satisfying the payment program. If a payment program ends up selecting more
than one(say 4) bank for payment, the ranking of the banks helps it select one
bank from the list of (say 4) selected banks.
|
4.3 What is SAP APO?
|
|
SAP APO stands for Advanced Planner and Optimizer, which is one area of SCM and
application component of MySAP product. Its is designed to provide solutions
for companies in Demand planning, network design, supply network planning,
production planning and global available to promise, transportation and
scheduling.
|
4.4 What are the support tickets given in SAP fico module? please give some
examples.
|
|
Support tickets are basically the problems that arise in day to day usage of
SAP. So any sap fico consultant who is resolving the day to day production
issues is actually supporting the tickets.
|
4.5 How is bank reconciliation handled in SAP?
|
|
The following are the steps for BRS:
1. Create Bank Master Data - This can be created through T.Code FI01 or you can
also create the house bank through IMG/FA/Bank accounting/Bank account
2. Define House Bank
3. Set up Bank selection payment programe- IMG/FA/ARAP/BT/AUTOIP/PM/Bank
selection for payment prg.
a. setup all co codes for payment transaction - Customer and vendors
b.setup paying co codes for payment transactions
c.setup payment method per country
d.setup payment method per co code for payment transaction
e.setup bank determination for payment transaction
Please go for Cheque mangement using T code FCHI
(IMG/FA/ARAP/BT/OP/AutoOp/PaymentMedia/CheckManagement) and for void reasons
FCHV. You can create Bank Reconcilliation statement by TC FF67
(SAP/AC/Treasury/CashManagement/Incomings/ManualBankStatement) . Don't forget
to keep the opening Balance as zero. Use FBEA for post process.
|
4.6 How do you configure electronic bank statement?
|
|
Following is the sequence of configuration to be done for Electronis Bank
Statment(EBS):
1. create Tranaction types( which helps you group all the house baks with same
External transaction code).
2. assign them to house banks.
3 create and define posting rule keys .
4 assign them to external transaction codes. external transaction codes are
bank specific codes for buisness tranactions( which it issues in each EBS) each
one for each type of payment. eg. transfer order, foreign transfer,bill of
exchange etc.
5 define posting specification for G/L posting as well as subledger posting
6. define account symbols(which determines the G/L account to be posted to) and
assign them to posting keys.
|
4.7 How do you configure manual bank statement?
|
|
configuration is required during electronic bank statment not in mannual bank
stament. In mannual bank statment you just have to enter the data on screen and
save it.
|
2.8 What is dunning?
|
|
Dunning is actually the process by which you “bill” or “invoice” a customer for
past due items. With regards bad Checks for example dunning procedure could
follow these steps:
• Step 1: Phone call to customer on receipt of bad check – at this stage,
perform the journal posting outlined in section on Returned Checks
• Step 2: Letter to customer (+10 days)
• Step 3: Letter to CO (+7 days)
• Step 4: Legal letter to customer (? DD139) (+13 days)
• Step 5: Issue DD139 (+10 days)
• Step 6: Follow-up on DD139 (dispersing officer) (+45 days)
• Step 7: Write-off (after 6 months)
Steps 2-6 above will be handled by dunning levels in SAP.
Configuration before dunning can be carried out
1. Defining Dunning Area
2. Define Dunning Keys
3. Define Dunning Block Reasons
4. Dunning Procedure
• Define Dunning Procedure (T. Code – FBMP), To set up a Dunning Procedure, the
following must be specified: number of Dunning Levels (1-9) Dunning Texts,
Standard Text can also be included in the Dunning Texts. Dunning Procedure
major parameters: Dunning Interval, Number of Dunning Levels, Grace Period
5. Assign Dunning Procedure to Customer / Vendors Accounts (T. Code – XD02)
6. Define Correspondence Types (T. Code – OB77)
7. Assign Company Codes to Correspondence company Codes
8. Assign Programs for Correspondence Types (OB78)
9. Dunning Run: Transaction Code: F150
Menu Path: accounting > financial accounting > accounts receivable >
periodic processing > dunning.
Note: Whenever you schedule more than one dunning run a day, the
"Identification" number must change. You may run several dunning runs on the
same date but the "Identification" name must be different as well as certain
parameters such as the “Dunning Date” and “Documents Posted up to” date.
|
4.9 What is the difference between profit center accounting and Profitability
analysis ?
|
|
profit center accounting is basicaly done for internal controlling purposes. It
lets you determine the profit and loss using the cost of sale approach or
period accounting approach. Here you can find the profit from an "area of
reponsibility or pserson" point of view.this is accound based costing Whereas
in Profitability analysis, market segments based on product , cutomer,order aor
any comobination of these are studied to find wots the profit. PA provides
information to the marketing,sales and planning department so that they can
make decisions. PA has two forms account based and CO based. both these are
tools for profit managment, and both are alternative. They are not same.
|
4.10 What are the manufacturing cost of a producting?
|
|
In 1st case it is called as intracompany stock transfer and the 2nd case is
inter company stock transfer Stock Transfer between plants of same compnay code
only includes inventory movement without any pricing and so called Stock
Transfer Order where Stock Transfer between plants of different company code is
same as a purchase order as along with the inventory there is also accounts
transfer (pricing) involved.
|
4.11 What is the difference between stock transfer between two plants belongs
to same company code and to that of different company code?
|
|
In 1st case it is called as intracompany stock transfer and the 2nd case is
inter company stock transfer Stock Transfer between plants of same compnay code
only includes inventory movement without any pricing and so called Stock
Transfer Order where Stock Transfer between plants of different company code is
same as a purchase order as along with the inventory there is also accounts
transfer (pricing) involved.
|
4.12 In real time, How listing and exclusion is used ?
|
|
Listing and exclusion is used in chemical and pharma industries for
ex:-Particular customer is not having a valid licence of selling some
chemical/Medicines and he is ordering the same. in this case listing and
exclusion is usefull
|
4.12 What is the schema you use in Time Management?
|
|
Schema : TC00
|
4.13 What is the schema you use in Time Management?
|
|
Schema : TC00
|
4.14 In SAP-HR, What is the landscape of your project?
|
|
Landscape in SAP consists the following:
1. IDES = Training Server
2. Development Server
* Configuration (200 client)
* Sandbox (210 client)
* Data Change (220 client)
3. Quality Server
* Standby (300 client)
* Testing (310 client)
4. Production Server
* Pre-Production (400 client)
* Real Production (500 client)
|
4.15 What is the role of abapers? What is the Work Bench?
|
|
Abaper is a application programmer who retrives the data from the database and
show it to the end-user with the help of report..out of three layers of SAP the
abaper position is on Application Layer in which SAP programs are develop and
then transported to the Production server... Workbench... The ABAP Workbench
contains several tools that allow you to edit specific repository objects. like
ABAP Editor , Menu PAinter etc...
|
4.16 How to integrate MM With Fico?
|
|
ALV is Application List viewer. Sap provides a set of ALV (ABAP LIST VIEWER)
function modules which can be put into use to embellish the output of a report.
This set of ALV functions is used to enhance the readability and functionality
of any report output. Cases arise in sap when the output of a report contains
columns extending more than 255 characters in length. In such cases, this set
of ALV functions can help choose selected columns and arrange the different
columns from a report output and also save different variants for report
display. This is a very efficient tool for dynamically sorting and arranging
the columns from a report output. The report output can contain up to 90
columns in the display with the wide array of display
|
4.17 What is difference between business area or cost centre?
|
|
Business area is a place where the product or the produced components are
valued in group or for the total transactions carried out, Right from
procurement, production and sales of goods.
|
4.18 How to create Tax Calculation Procedure?
|
|
Tax calculation procedures based on the countries depended. one country is
using deferent of tax procedures. We are creating new country also and at what
type calculation procedures presenrt is running on the countryand it is
assighned which country used.
|
4.19 What is Legaccy System Migration Workbench? How it can be carried out in
SAP SD?
|
|
LSMW is widely used by EDI programmers. EDI Programmers connect the SAP system
to Non SAP system. During this Data migration is a necessity. When data
migrates from source to destination the destination code is differrent from the
source code. So what LSMW does is * Converts the data in to batch files * Then
converts the batch files in to source code batch files * And then mirgates
data. Standard Interfaces like BAPI or Idoc are used in this process.
|
4.20 What are the fields in purchasing view?
|
|
RFQ/Quotation
- Purchase requisition
- Purchase order
- Master data (Info record, Source list, Conditions, Vendors etc.)v - Outline
agreements
|
4.21 How do you create movement types? What are the steps involved? When will
you recommend a new movement type?
|
|
A movement type can be created using T code OMJJ. Copying an existing movement
type and modifying the field contents can create a new movement type. The SAP
system is delivered with some pre-defined movement types from 100 to 899. 900
onwards can be used for customized movement types.
|
|